Athabasca River Expedition: Connecting the Drops

   

Publication

Tailings Plan ReviewAn Assessment of Oilsands Company Submissions for Compliance with ERCB Directive 074
Published: Dec 1, 2009

A comprehensive review of regulatory documents filed with the Alberta government, conducted by the Pembina Institute and Water Matters, found that only two oilsands operations reported they would meet the rules to reduce toxic tailings between 2011 and 2013 (the start date for binding rules to capture and start solidifying liquid tailings). The seven remaining operations submitted plans that will not comply with rules for reducing their production of liquid tailings by the first target date in 2011. Some companies submitted plans suggesting they may not meet the rules for tailings management for over 40 years.

Download the backgrounder on tailings and Directive 074

Format: PDF, 36 pages

[Download the full assessment report]

Publication Type: Reports, Backgrounders & Position Papers

Topic Area: Athabasca River

   

Powered by Drupal and Zapatec.